Close X
Sunday, February 16, 2025
ADVT 
India

World's Highest Rail Bridge Taller Than Eiffel Tower On Chenab To Be Completed In Two Years

Darpan News Desk IANS, 04 May, 2017 11:26 AM
    In around two years from now, the Chenab in Jammu and Kashmir will be spanned by the world’s highest railway bridge that is expected to be 35 metres taller than the Eiffel Tower.
     
    The massive arch-shaped structure, being constructed at a cost of around Rs 1,100 crore in hostile terrain, will use over 24,000 tonnes of steel and will rise 359 metres above the river bed.
     
    Designed to withstand the wind speed of up to 260 km per hour, the 1.315-km-long “engineering marvel” will connect Bakkal (Katra) and Kauri (Srinagar).
     
    The bridge forms a crucial link in the 111-km stretch between Katra and Banihal, which is part of the Udhampur-Srinagar-Baramulla rail link project.
     
    “The construction of the bridge is the most challenging part of the Kashmir rail link project and once completed, it will be an engineering marvel,” said a senior Railway Ministry official involved with the project.
     
    Slated to be completed by 2019, it is expected to become a tourist attraction in the region. There will also be a ropeway in the bridge for inspection purposes.
     
    Once completed, it will surpass the record of the Shuibai railway bridge (275 m) over the Beipan river in China.
     
     
    Steel was the material of choice for constructing the humongous structure as it is economical and able to resist temperatures of -20°C and wind speeds of above 250 kmph.
     
    The Railways will also install sensors on the bridge to check the wind velocity. As soon as the wind speed exceeds 90 kmph, the signal on the track will turn red, preventing train movement.
     
    In order to enhance safety and security, the bridge will be made of 63mm thick special blast-proof steel as the Jammu and Kashmir region is prone to frequent terror attacks.
     
    The concrete pillars of the bridge will be designed to withstand explosions and will be painted with a special corrosion-resistant paint, which lasts for 15 years.
     
    According to the plan, a ring of aerial security will be provided to safeguard the bridge. An online monitoring and warning system will be installed on the bridge to protect the passengers and train in critical conditions. Footpaths and cycle trails will be built adjacent to it.
     
    It is expected to contribute to the economic development of the state and help in improving accessibility.
     
     
    SET To be a tourist attraction
     
    The massive arch-shaped structure, being constructed at a cost of around Rs 1,100 crore in hostile terrain over the Chenab, will use over 24,000 tonnes of steel and will rise 359 metres above the river bed
     
    Slated to be completed by 2019, it is expected to become a tourist attraction in the region
     
    To enhance safety and security, the bridge will be made of 63mm thick special blast-proof steel as the  region is prone to terror attacks

    MORE India ARTICLES

    Donald Trump Nominates Indian-Americans Vishal Amin And Neomi Rao As His 'IP Czars'

    Donald Trump Nominates Indian-Americans Vishal Amin And Neomi Rao As His 'IP Czars'
    Prominent Indian-Americans Vishal Amin and Neomi Rao will be Mr. Trump’s new IP and regulatory czars respectively as he nominated them on Friday while making many administrative appointments.

    Donald Trump Nominates Indian-Americans Vishal Amin And Neomi Rao As His 'IP Czars'

    Capt Amarinder Singh Reiterates Promise To Waive Farmers' Debt Soon

    Capt Amarinder Singh Reiterates Promise To Waive Farmers' Debt Soon
    Chief Minister Captain Amarinder Singh on Saturday reiterated his commitment to the waiver of farm debts, saying his government would soon find ways and means to bail out the debt-ridden farmers, with or without the help of the Centre. 

    Capt Amarinder Singh Reiterates Promise To Waive Farmers' Debt Soon

    Poll Promises Routinely Unfulfilled, Parties Must Be Held Accountable: CJI JS Khehar

    Poll Promises Routinely Unfulfilled, Parties Must Be Held Accountable: CJI JS Khehar
    Noting that poll promises routinely remain unfulfilled, Chief Justice of India JS Khehar on Saturday said that political parties must be held accountable for what they say in their election manifestos.

    Poll Promises Routinely Unfulfilled, Parties Must Be Held Accountable: CJI JS Khehar

    Abattoir Ban: 'Baratis' Boycott Veg Dishes At Indian Wedding Function

    Abattoir Ban: 'Baratis' Boycott Veg Dishes At Indian Wedding Function
    A ban on illegal slaughterhouses across Uttar Pradesh took a toll on wedding festivities in a village here with the ‘baratis’ refusing to partake the vegetarian platter.

    Abattoir Ban: 'Baratis' Boycott Veg Dishes At Indian Wedding Function

    Uttar Pradesh: Police Stop Church Event After Adityanath's Hindu Yuva Vahini Alleges Conversion

    Uttar Pradesh: Police Stop Church Event After Adityanath's Hindu Yuva Vahini Alleges Conversion
    Police stopped a church event attended by more than 150 people, including 10 American tourists, here after the right-wing Hindu Yuva Vahini (HYV) alleged that religious conversion was being carried out. 

    Uttar Pradesh: Police Stop Church Event After Adityanath's Hindu Yuva Vahini Alleges Conversion

    German Tourist Injured In Blade Attack In Delhi, Two Held

    German Tourist Injured In Blade Attack In Delhi, Two Held
    A 19-year-old German tourist was robbed and injured in a blade attack here by a rickshaw puller and his accomplice, who were both arrested within a day after the crime, police said on Saturday. The youth is being treated at a hospital.

    German Tourist Injured In Blade Attack In Delhi, Two Held