Close X
Monday, November 11, 2024
ADVT 
India

Wayanad disaster toll reaches 281, 200 still missing, CM Vijayan stresses on rehabilitation

Darpan News Desk IANS, 01 Aug, 2024 11:16 AM
  • Wayanad disaster toll reaches 281, 200 still missing, CM Vijayan stresses on rehabilitation

Wayanad (Kerala), Aug 1 (IANS) Kerala Chief Minister Pinarayi Vijayan on Thursday chaired an all-party meeting at Wayanad, which witnessed the state's worst-ever natural disaster as landslides devastated the area late on Tuesday night, leaving at least 281 dead and 200 missing and scores of habitations wiped out, thanked the massive efforts of the multi-pronged rescue team comprising over 1,200 professionals.

The massive rescue operation, involving personnel from all three defence forces, police, disaster relief agencies, and fire services, besides locals and volunteers, is currently on at the four worst-affected landslide areas of Wayanad -- Churalpara, Velarimala, Mundakayil, and Pothukalu.

Vijayan said the army has informed him that there is no chance of any more survivors in the worst-affected areas. However, a bailey bridge at Churalmala is now ready and will enable big earth-moving equipment to reach places which have been cut off.

"Now the need of the hour is for a proper rehabilitation programme and for that we have already started to work on it. We do have a good experience of handling rehabilitation and hence it will be done," he said.

More than 8,000 people have been evacuated safely and put up in 82 relief camps.

"With regards to the rehabilitation process, the relief camps will be functioning for a while as it will take time. Hence we have decided to cordon off the camp sites and they will be out of bounds for the media. Those people, who wish to see the members in the camps, can meet them only at the reception area. None other than the inmates of the camps will be allowed inside," Vijayan said, adding that nothing from outside will be distributed in the camps as the officials will ensure everything is given through a central distribution process.

"With regards to the education of the children in the camps. It has been decided all students in the affected areas can continue their education under the online method and it will be done from the place where they are put up. All those who lost their certificates will be given new ones," he said.

"The mental trauma is huge and hence counselling will be given and it has already begun. Tribal families are reluctant to come out from their surroundings and hence we will ensure food items are supplied to them. Now that a huge disaster has happened, we cannot afford another disaster, especially in a possible outbreak of an epidemic and for this purpose, all people should cooperate with the health officials. Disposal of dead animals is a challenge and it will be done in the right manner," he said.

The Chief Minister even since the disaster occurred, 12 cabinet ministers are at Wayanad and now we have decided to set up a four-member Cabinet sub-committee comprising of Ministers of Revenue, Forest, Public Works, and SC/ST."

"We have asked to declare this as a national disaster... it’s now the Centre to decide and we will wait for it," he added.

Expressing his displeasure at attempts to play politics, Vijayan said: "Even in this massive tragedy, some people are playing spoilsports and are trying to create problems, the best is such people should be ignored." However, he did not elaborate.

MORE India ARTICLES

Six children sustain injuries in bomb explosion in Begusarai

Six children sustain injuries in bomb explosion in Begusarai
Six children were injured after a bomb kept in an abandoned house exploded in Bihar’s Begusarai district on Tuesday afternoon. The victims have been identified as Nitish Kumar, Sintu Kumar, Bhulli Kumari, Ankush Kumar, Swati Kumari and one more child whose identity could not be ascertained.  

Six children sustain injuries in bomb explosion in Begusarai

Congress delegation meets EC seeking action against PM Modi, Shah

Congress delegation meets EC seeking action against PM Modi, Shah
A delegation of Congress on Tuesday met the Election Commission and sought action against Prime Minister Narendra Modi and Home Minister Amit Shah over violation of the Model Code of Conduct for their remarks on its party leaders despite submitting a complaint few days ago. The party said that it is as much the credibility of the Commission which is a stake as of the Model Code of Conduct.

Congress delegation meets EC seeking action against PM Modi, Shah

Air quality improves at several monitoring stations, Delhi records max temp of 22 degree Celsius

Air quality improves at several monitoring stations, Delhi records max temp of 22 degree Celsius
The air quality in the national Capital continued to remain under the ‘very poor’ category on Tuesday evening with the AQI at 318, according to data from the System of Air Quality and Weather Forecasting And Research (SAFAR). Meanwhile the India Meteorological Department said that the maximum temperature in the national Capital was registered at 22 degrees Celsius, four notches below the seasonal average.

Air quality improves at several monitoring stations, Delhi records max temp of 22 degree Celsius

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand
Minister for Road Transport and Highways Nitin Gadkari on Tuesday said that he was relieved as all the 41 trapped workers from the under-construction Silkyara tunnel in Uttarakhand were rescued safely. He said that it was a well coordinated effort by multiple agencies marking one of the most significant rescue operations in recent years.  

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand

Uttarkashi tunnel drilling halted after auger machine platform collapses

Uttarkashi tunnel drilling halted after auger machine platform collapses
The operation to rescue 41 workers trapped inside the collapsed Silkyara tunnel in Uttarakhand's Uttarkashi district was halted after the platform supporting the auger machine which is drilling through the debris collapsed on Thursday evening. Girish Singh Rawat, one of the members of the rescue operation team, said: "Drilling cannot be done until the platform is ready. It may take five to six hours to get the platform ready."

Uttarkashi tunnel drilling halted after auger machine platform collapses

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed
The National High Speed Rail Corporation Limited (NHSRCL) said that 100 km of viaducts were ready for the 508 km of the mega Mumbai-Ahmedabad High Speed Rail Corridor project while 250 km of pier work has been completed. The NHSRCL said that on November 25, 2021 first girder was launched while the first km of viaduct was completed on June 30, 2022 in a span of six months.

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed