Close X
Saturday, November 23, 2024
ADVT 
India

Uninterrupted power supply in UP for 24 hours from today

Darpan News Desk IANS, 22 Jan, 2024 04:05 PM
  • Uninterrupted power supply in UP for 24 hours from today

Lucknow, Jan 22 (IANS) Uttar Pradesh will get uninterrupted power supply for 24 hours on Monday in view of the programmes scheduled for the Pran Pratishtha ceremony at the Ram temple in Ayodhya.

According to orders issued by UPPCL chairman Ashish Kumar Goel, “Over the next 24 hours, all regions of the state will enjoy power without any interruptions in line with the chief minister’s directives.”

The chairman directed departmental officials to exercise utmost caution in this regard.

He also said all major buildings of the energy department, such as the Shakti Bhawan and SLDC building, had been illuminated.

Meanwhile, the entire district of Ayodhya will get uninterrupted power supply till January 24, the discom said.

As per the current roster, villages face load-shedding for six hours every day while agriculture feeders get power supply for only 10 hours. Tehsil headquarters and urban local bodies face official rostering for two-and-half hours.

MORE India ARTICLES

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand
Minister for Road Transport and Highways Nitin Gadkari on Tuesday said that he was relieved as all the 41 trapped workers from the under-construction Silkyara tunnel in Uttarakhand were rescued safely. He said that it was a well coordinated effort by multiple agencies marking one of the most significant rescue operations in recent years.  

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand

Uttarkashi tunnel drilling halted after auger machine platform collapses

Uttarkashi tunnel drilling halted after auger machine platform collapses
The operation to rescue 41 workers trapped inside the collapsed Silkyara tunnel in Uttarakhand's Uttarkashi district was halted after the platform supporting the auger machine which is drilling through the debris collapsed on Thursday evening. Girish Singh Rawat, one of the members of the rescue operation team, said: "Drilling cannot be done until the platform is ready. It may take five to six hours to get the platform ready."

Uttarkashi tunnel drilling halted after auger machine platform collapses

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed
The National High Speed Rail Corporation Limited (NHSRCL) said that 100 km of viaducts were ready for the 508 km of the mega Mumbai-Ahmedabad High Speed Rail Corridor project while 250 km of pier work has been completed. The NHSRCL said that on November 25, 2021 first girder was launched while the first km of viaduct was completed on June 30, 2022 in a span of six months.

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed

Delhi Horror: Demon's street dance, firearms, knives dominate juvenile's social media

Delhi Horror: Demon's street dance, firearms, knives dominate juvenile's social media
Social media posts of the juvenile who stabbed a 17-year-old over 70 times during a street robbery here, likely hinted at his inclination towards violence or "thirst for blood". The accused minor shared videos on his social media account, displaying knives, firearms, and footage of himself within court premises portraying a criminal image, possibly fostering a misguided sense of pride.

Delhi Horror: Demon's street dance, firearms, knives dominate juvenile's social media

Man who threatened to blow up Mumbai Airport nabbed from Kerala

Man who threatened to blow up Mumbai Airport nabbed from Kerala
On Thursday, the Chhatrapati Shivaji Maharaj International Airport (CSMIA) received an anonymous email threatening to "blow up Terminal 2 within 48 hours" if the man making the threat was not paid an amount of $1 million in Bitcoin. Following the ultimatum, the Mumbai International Airport Ltd. Lodged a complaint with the Sahar police station which swung into action.  

Man who threatened to blow up Mumbai Airport nabbed from Kerala

Punjab CM assures protesting sugarcane growers of hiking procurement rate

Punjab CM assures protesting sugarcane growers of hiking procurement rate
Facing protests by sugarcane growers, Punjab Chief Minister Bhagwant Mann on Friday assured that the state government would continue to give them highest rate in the coming times. Interacting with the media after meeting farmer unions here, he said the government has always been on top to provide rates to the sugarcane cultivators and now also this trend will be continued.  

Punjab CM assures protesting sugarcane growers of hiking procurement rate