Close X
Wednesday, November 27, 2024
ADVT 
India

PM Modi to lay foundation for NLC India's 2,400 MW Odisha power project

Darpan News Desk IANS, 02 Feb, 2024 05:12 PM
  • PM Modi to lay foundation for NLC India's 2,400 MW Odisha power project

Chennai, Feb 2 (IANS) Prime Minister Narendra Modi on Saturday will be laying the foundation stone for the first phase of the 3,200 MW pit head green field thermal power project in Odisha being built by the integrated lignite/coal mining and power generation company NLC India Ltd, said a top company official.

He also said the company plans a capital expenditure of about Rs 40,000 crore next fiscal and the lignite to methanol project is expected to be operational in 2027-28 and would produce 1,200 tonnes per day.

Speaking to reporters, Prasanna Kumar Motupalli, Chairman and Managing Director (CMD) said the first phase will be 2,400 MW (3x800 MW) for which PM Modi will be laying the foundation stone. The second phase – 800 MW- plant will come up later.

The power project will be at Jharsuguda District in Odisha based on Ultra Super Critical Technology.

Motupalli said the first phase will go on stream in 2028-29. According to Motupalli, the total outlay for both the phases will be over Rs 35,000 crore and for the first phase it will be about Rs 27,200 crore.

As regards the funding, he said it will be a mix of debt, internal accruals and amount raised from asset monetization.

NLC India will be raising about Rs 5,000 crore by transferring about 1.4 GW of renewable power capacity to its renewable energy subsidiary.

Queried about the extent of land for the Odisha project and how much has been acquired Motupalli said, the total need is about 1,600 MW out of which about 600 acres has been acquired and over 300 acres is under company’s possession.

The 3,200 MW project will be the single largest power project under the Minstry of Coal, he said.

According to him, the power generated from the first phase will be supplied to Tamil Nadu-1,500 MW, Odisha-400 MW, Kerala-400 MW and Puducherry-100 MW.

As regards the power supply from the second phase, 400 MW will be for Odisha and balance will be decided by the Ministry of Coal. Be that as it may, NLC India has awarded over Rs 15,000 crore engineering, procurement and construction (EPC) contract to Bharat Heavy Electricals Ltd (BHEL) for 2,400 MW power project. The coal linkage available from 20 MTPA Talabira II & III OCP mines of NLC India which is already operational from the year 2020 in Jharsuguda and Sambalpur districts of Odisha.

The water required for the project is linked from Hirakud Reservoir.

Boilers will be designed to suite the co-firing of bio mass as part of 'green' initiative.

Being a pit head thermal power project, the variable cost will be competitive and NLC India will be generating and providing low-cost power to its beneficiaries, the company said.

Motupalli said NLC India will also be adding 2x660 MW capacity in Neyveli in Tamil Nadu.

MORE India ARTICLES

Lingayat mutt sex scandal: Arrest warrant against rape accused Murugha seer

Lingayat mutt sex scandal: Arrest warrant against rape accused Murugha seer
The Chitradurga Second Additional District and Sessions Court issued the order considering the submission by the public prosecutor, Jagadish. The rape accused seer was released on November 16 following the granting of conditional bail in the first POCSO case.  

Lingayat mutt sex scandal: Arrest warrant against rape accused Murugha seer

Two-day Punjab Assembly session on Nov 28-29

Two-day Punjab Assembly session on Nov 28-29
Punjab Cabinet led by Chief Minister Bhagwant Singh Mann on Monday approved summoning of the fifth session of 16th Vidhan Sabha on November 28-29. The decision was taken by the Council of Ministers at its meeting held under the chairmanship of the Chief Minister.

Two-day Punjab Assembly session on Nov 28-29

Two killed in Manipur by armed cadres, tribal body declares 48-hr shut down in Kangpokpi district

Two killed in Manipur by armed cadres, tribal body declares 48-hr shut down in Kangpokpi district
In a fresh incident of violence in Manipur, two people were killed by unidentified armed group in Kangpokpi district on Monday, police said. Police said that the incident occurred at Kangchup area in tribal-dominated Kangpokpi district.  

Two killed in Manipur by armed cadres, tribal body declares 48-hr shut down in Kangpokpi district

Delhi: Air quality continues to be in 'very poor' category

Delhi: Air quality continues to be in 'very poor' category
Air quality across Delhi continues to be in the 'very poor' category on Monday as the overall AQI of the city reached 323, according to data from the System of Air Quality and Weather Forecasting And Research (SAFAR). In the national capital, the Anand Vihar station recorded the air in the 'very poor' category with PM 2.5 at 342 and PM 10 at 301, as per the Central Pollution Control Board (CPCB).  

Delhi: Air quality continues to be in 'very poor' category

Amazon laying off hundreds in Alexa division, India team impacted

Amazon laying off hundreds in Alexa division, India team impacted
Amazon is laying off “several hundred employees” from its Alexa devision, including in India, amid a renewed focus on artificial intelligence (AI), the media reported on Friday. In a memo sent to employees and seen by GeekWire, Daniel Rausch, vice president of Alexa and Fire TV team, said that the company is eliminating “several hundred roles”.  

Amazon laying off hundreds in Alexa division, India team impacted

Historian B N Goswamy passes away

Historian B N Goswamy passes away
Known for his path-breaking work on Pahari paintings, internationally-acclaimed art historian and an authority on miniature painting, Chandigarh-based Brijinder Nath Goswamy, passed away on Friday following prolonged ill health. Recipient of the Padma Shri and Padma Bhushan awards, 90-year-old Goswamy, fondly called BNG in art circles had authored more than 26 books.

Historian B N Goswamy passes away