Close X
Friday, November 15, 2024
ADVT 
India

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed

Darpan News Desk IANS, 24 Nov, 2023 06:06 PM
  • Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed

New Delhi, Nov 24 (IANS) The National High Speed Rail Corporation Limited (NHSRCL) said that 100 km of viaducts were ready for the 508 km of the mega Mumbai-Ahmedabad High Speed Rail Corridor project while 250 km of pier work has been completed.

The NHSRCL said that on November 25, 2021 first girder was launched while the first km of viaduct was completed on June 30, 2022 in a span of six months.

The completion of 50 km of viaduct was completed in a span of 10 months on April 22, 2023 and 100 km in the next six months, it said.

It said that the project achieved this milestone of construction of cumulative 100 km of viaducts through launching of 40 m long full span box girders and segmental girders.

The corporation said the full span launching technique (FSLM), where 40 meters long box girders are launched through state-of-the-art launching equipment, are being used along with Span by Span launching of segments.

"FSLM is 10 times faster than the launching through Span by Span method, which is normally used for constructing metro viaducts," the NHSRCL said, which is looking at the construction of India's first Bullet train project.

The NHSRCL also said that the 250 km of pier work has also been completed for the project

"The viaducts include bridges over Six rivers -- Par in Valsad district, Purna in Navsari district, Mindhola in Navsari district, Ambika in Navsari district, Auranga in Valsad district and Venganiya Navsari district, all in Gujarat.

"Even the installation of noise barriers has already started on the constructed viaduct."

The NHSRCL also said that the laying of first Reinforced Concrete (RC) track bed for the MAHSR corridor track system as used in Japanese Shinkansen has also started in Gujarat's Surat.

"This is for the first time, the J-slab ballastless track system is being used in India," it said.

Giving more update on the project, the corporation said, "Breakthrough of first mountain tunnel of 350 metre has been completed in Gujarat's Valsad district and even the first steel bridge of 70 m length has been erected in Gujarat's Surat.

"This is the first of the 28 steel bridges which will be part of the MAHSR corridor," the NHSRCL said.

The foundation stone for India's first Mumbai-Ahmedabad High Speed Rail Project was laid in September 2017 by Prime Minister Narendra Modi and his then Japanese counterpart Shinzo Abe.

The project is scheduled to be completed by 2026.

MORE India ARTICLES

Arnab Goswami tenders unconditional apology to former TERI chief before Delhi HC

Arnab Goswami tenders unconditional apology to former TERI chief before Delhi HC
Pachauri had filed a contempt of court petition in February 2016, alleging several media houses for deliberately and contemptuously not following the court's orders restricting them from publishing sexual harassment claims against him.  The affidavit further read that Goswami is a respectable citizen of the country, who abides by the law and holds all courts in high esteem.

Arnab Goswami tenders unconditional apology to former TERI chief before Delhi HC

To boost farmers' income, Punjab bringing new policy on June 30

To boost farmers' income, Punjab bringing new policy on June 30
Presiding over the meeting regarding the demands of the Sanyukta Kisan Morcha here, Dhaliwal said the new agricultural policy is being prepared with the aim of boosting the income of the farmers.  Also, the government is making efforts to solve many problems of the farmers. 

To boost farmers' income, Punjab bringing new policy on June 30

Member of Lawrence Bishnoi gang nabbed after exchange of fire in Delhi

Member of Lawrence Bishnoi gang nabbed after exchange of fire in Delhi
The accused identified as Yogesh alias Gogha, was previously involved in 16 criminal cases, including attempt to murder, robbery, dacoity,criminal intimidation and the Arms Act, registered in Delhi and its peripherals.

Member of Lawrence Bishnoi gang nabbed after exchange of fire in Delhi

Sisodia withdraws interim bail pleas filed before Delhi HC to help his ailing wife

Sisodia withdraws interim bail pleas filed before Delhi HC to help his ailing wife
The same single-judge bench had on May 11 directed the jail superintendent to provide Sisodia with a video conferencing facility to speak to his wife every alternate day between 3-4 p.m. as per prison rules, till the disposal of the bail plea.

Sisodia withdraws interim bail pleas filed before Delhi HC to help his ailing wife

One dead, five injured after DTC bus loses control in Delhi; driver held

One dead, five injured after DTC bus loses control in Delhi; driver held
The mishap occurred at around 4:45 p.m. when the bus going from Nehru Place to Maharani Bagh lost control and rammed into multiple vehicles, causing the death of one person besides leaving five others injured, two of them critically. The identity of the deceased man is yet to be ascertained.

One dead, five injured after DTC bus loses control in Delhi; driver held

Sukhbir Badal to attend new Parliament inauguration ceremony

Sukhbir Badal to attend new Parliament inauguration ceremony
Cheema also took on both the Aam Aadmi Party (AAP) and the Congress which have decided to boycott the inauguration ceremony. He said AAP was talking about the issue being one of respect for the President.

Sukhbir Badal to attend new Parliament inauguration ceremony