Close X
Monday, November 11, 2024
ADVT 
India

India needs to increase solar capacity by 36% every year: Ember

Darpan News Desk IANS, 03 Oct, 2023 12:31 PM
  • India needs to increase solar capacity by 36% every year: Ember

New Delhi, Oct 3 (IANS) India needs to increase annual solar capacity additions by 36 per cent every year to meet its 2027 target, a new analysis by global energy think tank Ember said on Tuesday.

Solar and wind could drive two-third of power generation growth by 2032 if India is on track to deliver its electricity plan, based on its analysis.

This means that growth of India’s future power generation will not be driven by coal.

Solar power transitioned from the formative phase in FY2017, reaching a one per cent share in India’s power mix. If India achieves its solar targets set out in the 14th National Electricity Plan (NEP14), its share is expected to increase five-fold, from five to 25 per cent in the FY 2022-32, marking a period of “accelerating growth”.

This implies that the country’s power generation growth, predominantly driven by coal in the last decade, could enter a stage with most of its power expansion over the next 10 years driven by solar and wind, provided India is on track to deliver its NEP14 targets, finds the analysis.

 As India’s solar adoption widens, there is also a growing need for a much higher level of storage capacity to be able to manage peak demand in the evenings and early mornings, underscored by recent power shortages.

“India’s electricity supply landscape is projected to change quite significantly in the next decade or so, with solar and wind likely to drive the growth in generation,” says Neshwin Rodrigues, Ember’s India Electricity Policy Analyst.

“Given their variable nature, a significant increase in storage capacity is crucial to balance generation and demand.”

As India is scaling up investments to renewable energy, the government now plans to tender 50 GW of solar and wind capacity per year in the following five financial years.

However, to achieve the ambitious NEP14 targets, India needs to increase its current annual solar capacity addition by about 36 per cent each year leading up to 2026-27.

This means that India would need to commission at least 17.5 GW in FY2024, with a further ramp-up to 41 GW by the 2027 target year.

MORE India ARTICLES

Spring Dale School in Amritsar receives bomb threat

Spring Dale School in Amritsar receives bomb threat
The threat came four days after the DAV Public School got a similar threat, which later proved to be a prank made by three students of the school. A message uploaded on social media on Monday evening read that there would be a blast in Spring Dale School on September 16 .

Spring Dale School in Amritsar receives bomb threat

Gold worth over Rs 5 crore seized at Mumbai airport, 6 Sudanese nationals arrested

Gold worth over Rs 5 crore seized at Mumbai airport, 6 Sudanese nationals arrested
The official said that the group of 23 Sudanese gathered and attempted to clear the green channel by creating ruckus and divert attention of the customs officers. "The Sudanese passengers deliberately created a ruckus at customs arrival area through visible signs and acts of aggression including shouting at the officers and even indulging in physical bouts," the official said.

Gold worth over Rs 5 crore seized at Mumbai airport, 6 Sudanese nationals arrested

NIA raids 60 locations linked to gangsters Lawrence Bishnoi, Kala Jathedi, others

NIA raids 60 locations linked to gangsters Lawrence Bishnoi, Kala Jathedi, others
The NIA had been mulling action against big gangsters like Bishnoi, Kapil Sangwan and Neeraj Bawana and their aides. The Union Home Ministry had asked the NIA to uproot their entire network as they were involved in targeted killings and were acting like terrorists.

NIA raids 60 locations linked to gangsters Lawrence Bishnoi, Kala Jathedi, others

Goa Police to handover Phogat case to CBI today

Goa Police to handover Phogat case to CBI today
The Chief Minister said investigation into the case was almost completed.. Phogat had come to Goa on August 22 and was staying at a hotel in Anjuna. She felt uneasy that night and the next morning, she was taken to the St. Anthony's hospital where she was declared brought dead.

Goa Police to handover Phogat case to CBI today

Punjab to solarise one lakh electric tubewells

Punjab to solarise one lakh electric tubewells
The government provides free power to 13.88 lakh farmers of the state for their grid connected tubewells for irrigation and bears the expenditure of approximately Rs 7,000 crore as subsidy being paid to the Punjab State Power Corporation Ltd (PSPCL).

Punjab to solarise one lakh electric tubewells

3 college students killed as their van plunges into well in Coimbatore

3 college students killed as their van plunges into well in Coimbatore
The incident occurred at Thondamathur in Coimbatore district. Tamil Nadu fire and rescue department and local police are engaged in the process to lift the vehicle from the well-using cranes. Police said that rash driving could be the reason for the accident.

3 college students killed as their van plunges into well in Coimbatore