Close X
Monday, September 23, 2024
ADVT 
India

India needs to increase solar capacity by 36% every year: Ember

Darpan News Desk IANS, 03 Oct, 2023 12:31 PM
  • India needs to increase solar capacity by 36% every year: Ember

New Delhi, Oct 3 (IANS) India needs to increase annual solar capacity additions by 36 per cent every year to meet its 2027 target, a new analysis by global energy think tank Ember said on Tuesday.

Solar and wind could drive two-third of power generation growth by 2032 if India is on track to deliver its electricity plan, based on its analysis.

This means that growth of India’s future power generation will not be driven by coal.

Solar power transitioned from the formative phase in FY2017, reaching a one per cent share in India’s power mix. If India achieves its solar targets set out in the 14th National Electricity Plan (NEP14), its share is expected to increase five-fold, from five to 25 per cent in the FY 2022-32, marking a period of “accelerating growth”.

This implies that the country’s power generation growth, predominantly driven by coal in the last decade, could enter a stage with most of its power expansion over the next 10 years driven by solar and wind, provided India is on track to deliver its NEP14 targets, finds the analysis.

 As India’s solar adoption widens, there is also a growing need for a much higher level of storage capacity to be able to manage peak demand in the evenings and early mornings, underscored by recent power shortages.

“India’s electricity supply landscape is projected to change quite significantly in the next decade or so, with solar and wind likely to drive the growth in generation,” says Neshwin Rodrigues, Ember’s India Electricity Policy Analyst.

“Given their variable nature, a significant increase in storage capacity is crucial to balance generation and demand.”

As India is scaling up investments to renewable energy, the government now plans to tender 50 GW of solar and wind capacity per year in the following five financial years.

However, to achieve the ambitious NEP14 targets, India needs to increase its current annual solar capacity addition by about 36 per cent each year leading up to 2026-27.

This means that India would need to commission at least 17.5 GW in FY2024, with a further ramp-up to 41 GW by the 2027 target year.

MORE India ARTICLES

Vaishali Takkar was set to marry US-based techie in December

Vaishali Takkar was set to marry US-based techie in December
Television actress Vaishali Takkar, who died by suicide at her residence in Indore on Sunday, was about to marry a US-based software engineering in December.  She had also made elaborate plans for the wedding shopping and hosting a party after the Diwali. However, Vaishali took the extreme step on Sunday after she was reportedly harassed by her neighbour, who is currently on the loose.

Vaishali Takkar was set to marry US-based techie in December

Was pressured to quit AAP during CBI grilling, claims Sisodia; agency refutes

Was pressured to quit AAP during CBI grilling, claims Sisodia; agency refutes
Addressing the media at his residence on Monday evening after nine hours of interrogation by the CBI at its headquarters here in connection with the case, Sisodia said, "During questioning, I understood that this is not a case about excise policy or corruption. The case is only aimed at making 'Operation Lotus' a success in Delhi." 

Was pressured to quit AAP during CBI grilling, claims Sisodia; agency refutes

Lakhimpur Kheri case: SC grants UP 2 weeks for response on Ashish Mishra's bail plea

Lakhimpur Kheri case: SC grants UP 2 weeks for response on Ashish Mishra's bail plea
A bench of Justices B.R. Gavai and B.V. Nagarathna said it will hear the matter on November 7.  Senior advocate Mukul Rohatgi, representing Mishra, submitted that notice was already issued in the matter. 

Lakhimpur Kheri case: SC grants UP 2 weeks for response on Ashish Mishra's bail plea

Highly infectious new Omicron sub variant BF.7 detected in India

Highly infectious new Omicron sub variant BF.7 detected in India
According to some reports, the first case of BF.7 has been detected by the Gujarat Biotechnology Research centre. This new Omicron variant is also considered to be highly infectious and has a greater transmissibility. Omicron sub-variants -- BA.5.1.7 and BF.7 -- after emerging from a region of Mongolia in China are now making their way to other parts and posing fresh threats.

Highly infectious new Omicron sub variant BF.7 detected in India

Protest to continue until demands are met, say farmers

Protest to continue until demands are met, say farmers
Farmers stated that they have been protesting at zero point of Yamuna Expressway for the last three days for their various demands, yet they are being ignored. "The District Administration wants to forcefully end the protest, but we will not allow it to happen," they alleged.  Recently, Rakesh Tikait, the national spokesperson of the Bharatiya Kisan Union, had also come to participate in this demonstration. 

Protest to continue until demands are met, say farmers

Ahead of panchayat polls in Haryana, Dera Sacha Sauda chief gets 40-day parole

Ahead of panchayat polls in Haryana, Dera Sacha Sauda chief gets 40-day parole
During the parole, he will be staying on the Dera's premises in Rajasthan. He has been lodged in Sunaria jail since 2017 after being convicted in rape and murder cases. Last year he was also released from the jail thrice for various reasons, including his plea to meet the ailing mother.

Ahead of panchayat polls in Haryana, Dera Sacha Sauda chief gets 40-day parole