Close X
Monday, January 27, 2025
ADVT 
India

Cabinet green lights Rs 6,230 crore Rithala-Kundli corridor of Delhi Metro

Darpan News Desk IANS, 06 Dec, 2024 03:13 PM
  • Cabinet green lights Rs 6,230 crore Rithala-Kundli corridor of Delhi Metro

New Delhi, Dec 6 (IANS) The Union Cabinet, chaired by Prime Minister Narendra Modi, on Friday approved the Rithala-Narela-Nathupur (Kundli) corridor of Delhi Metro's Phase-IV project with Rs 6,230 crore outlay.

The 26.463 km-long corridor will further enhance connectivity between the national capital and neighbouring Haryana. The corridor is scheduled to be completed in 4 years from the date of its sanction, said the Cabinet.

The completion cost is to be implemented by Delhi Metro Rail Corporation Limited (DMRC) under the existing 50:50 Special Purpose Vehicle (SPV) of the central government and the Government of National Capital Territory of Delhi (GNCTD) in four years.

According to a Cabinet note, this Metro line will be an extension of the presently operational Shaheed Sthal (New Bus Adda)-Rithala (Red Line) corridor and will boost connectivity in the north-western parts of the national capital in areas such as Narela, Bawana, parts of Rohini etc.

The entire stretch will comprise 21 stations. All the stations of this corridor will be elevated. This corridor will be Delhi Metro's fourth extension into Haryana. Presently, the Delhi Metro operates up to Gurugram, Ballabhgarh and Bahadurgarh in Haryana.

After completion, the Rithala-Narela-Nathupur corridor will also connect Shaheed Sthal New Bus Adda station in Ghaziabad, Uttar Pradesh with Nathupur in Haryana via Delhi, which will tremendously boost connectivity in the entire National Capital Region.

“This extension of the Red Line will reduce congestion on the roads, thus, will help in reducing the pollution caused by motor vehicles,” said the Cabinet.

According to the Cabinet, the construction of Phase-IV (3 Priority Corridors), consisting of 65.202 km and 45 stations, is underway, and more than 56 per cent of construction has been completed.

The Phase-IV (3 Priority) corridors are likely to be completed in stages by March 2026. In addition, two more corridors, comprising 20.762 kilometres, have also been approved and are in the pre-tendering stages.

The Delhi Metro currently caters to on average 64 lakh passenger journeys. The maximum passenger journey recorded so far is 78.67 lakh on November 18.

MORE India ARTICLES

Ten killed in lightning strikes in Bihar

Ten killed in lightning strikes in Bihar
Ten people lost their lives due to lightning strikes in the last 24 hours in Bihar, said officials on Thursday. Three persons died in Rohtas, two in Siwan, and one each in Kaimur, West Champaran, Supaul, Munger and Banka districts.

Ten killed in lightning strikes in Bihar

18 years on, 7/11 terror mayhem on Mumbai railway trains is a faint memory

18 years on, 7/11 terror mayhem on Mumbai railway trains is a faint memory
Snuffing out 209 innocents, the terror attack became the second worst extremist disaster in Mumbai, preceded by the March 12, 1993 serials bomb blasts (257 killed) and followed by the November 26-29, 2008 terror strikes (166+9 terrorists killed).

18 years on, 7/11 terror mayhem on Mumbai railway trains is a faint memory

Historic Day for Vizhinjam Port: Gautam Adani on 1st mothership vessel's arrival

Historic Day for Vizhinjam Port: Gautam Adani on 1st mothership vessel's arrival
With the arrival of the first mother ship, Adani Group’s Vizhinjam Port has catapulted India into the world port business as globally this port will rank 6th or 7th. The official function will take place on Friday.

Historic Day for Vizhinjam Port: Gautam Adani on 1st mothership vessel's arrival

India's gold processing industry to create 25,000 new jobs: Report

India's gold processing industry to create 25,000 new jobs: Report
Domestic gold production of incumbents and new players will expand to 100 tonnes by 2030, adding significantly to the foreign exchange reserves, improving trade balance and contributing to the GDP, said the industry body PHDCCI (PHD Chamber of Commerce and Industry).

India's gold processing industry to create 25,000 new jobs: Report

President Murmu accepts credentials from envoys of four nations

President Murmu accepts credentials from envoys of four nations
The Ministry of External Affairs stated that the envoys who presented their credentials to President Murmu were Ambassador Lumumba Maklele Nyajok (South Sudan); Ambassador Stella Nkomo (Zimbabwe); Ambassador Juan Antonio March Pujol (Spain); and, Ambassador Mariano Agustin Caucino (Argentina).

President Murmu accepts credentials from envoys of four nations

Puri hails SBI report, claiming four-fold job creation in 2014-24 as compared to 2004-14

Puri hails SBI report, claiming four-fold job creation in 2014-24 as compared to 2004-14
He also expressed happiness over the Micro, Small and Medium Enterprises (MSME) registering a total employment generation of about 20 crore in the small scale industry, as per data shared by the Udyam portal.

Puri hails SBI report, claiming four-fold job creation in 2014-24 as compared to 2004-14