Close X
Friday, January 10, 2025
ADVT 
India

Cabinet green lights Rs 6,230 crore Rithala-Kundli corridor of Delhi Metro

Darpan News Desk IANS, 06 Dec, 2024 03:13 PM
  • Cabinet green lights Rs 6,230 crore Rithala-Kundli corridor of Delhi Metro

New Delhi, Dec 6 (IANS) The Union Cabinet, chaired by Prime Minister Narendra Modi, on Friday approved the Rithala-Narela-Nathupur (Kundli) corridor of Delhi Metro's Phase-IV project with Rs 6,230 crore outlay.

The 26.463 km-long corridor will further enhance connectivity between the national capital and neighbouring Haryana. The corridor is scheduled to be completed in 4 years from the date of its sanction, said the Cabinet.

The completion cost is to be implemented by Delhi Metro Rail Corporation Limited (DMRC) under the existing 50:50 Special Purpose Vehicle (SPV) of the central government and the Government of National Capital Territory of Delhi (GNCTD) in four years.

According to a Cabinet note, this Metro line will be an extension of the presently operational Shaheed Sthal (New Bus Adda)-Rithala (Red Line) corridor and will boost connectivity in the north-western parts of the national capital in areas such as Narela, Bawana, parts of Rohini etc.

The entire stretch will comprise 21 stations. All the stations of this corridor will be elevated. This corridor will be Delhi Metro's fourth extension into Haryana. Presently, the Delhi Metro operates up to Gurugram, Ballabhgarh and Bahadurgarh in Haryana.

After completion, the Rithala-Narela-Nathupur corridor will also connect Shaheed Sthal New Bus Adda station in Ghaziabad, Uttar Pradesh with Nathupur in Haryana via Delhi, which will tremendously boost connectivity in the entire National Capital Region.

“This extension of the Red Line will reduce congestion on the roads, thus, will help in reducing the pollution caused by motor vehicles,” said the Cabinet.

According to the Cabinet, the construction of Phase-IV (3 Priority Corridors), consisting of 65.202 km and 45 stations, is underway, and more than 56 per cent of construction has been completed.

The Phase-IV (3 Priority) corridors are likely to be completed in stages by March 2026. In addition, two more corridors, comprising 20.762 kilometres, have also been approved and are in the pre-tendering stages.

The Delhi Metro currently caters to on average 64 lakh passenger journeys. The maximum passenger journey recorded so far is 78.67 lakh on November 18.

MORE India ARTICLES

Gujarat govt announces Rs 1419 crore relief package for farmers ahead of Diwali

Gujarat govt announces Rs 1419 crore relief package for farmers ahead of Diwali
Agriculture Minister Raghavji Patel explained that the package comprises Rs 1,419.62 crore in total assistance, including provisions from the State Disaster Response Fund (SDRF). The state government has also allocated additional funds from its budget to address the severity of the losses experienced by farmers.

Gujarat govt announces Rs 1419 crore relief package for farmers ahead of Diwali

Priyanka Gandhi owns assets worth Rs 12 crore, Robert Vadra worth Rs 66 crore IANS

Priyanka Gandhi owns assets worth Rs 12 crore, Robert Vadra worth Rs 66 crore IANS
Priyanka Gandhi filed three sets of nominations before the Wayanad District Collector on Wednesday, and the information about her and her husband's assets came in the affidavit she filed, as per the mandatory requirement for every candidate who files a nomination to contest an election in the country.

Priyanka Gandhi owns assets worth Rs 12 crore, Robert Vadra worth Rs 66 crore IANS

PM Modi meets Presidents of UAE and Uzbekistan before concluding 'successful' Russia visit

PM Modi meets Presidents of UAE and Uzbekistan before concluding 'successful' Russia visit
Prime Minister Narendra Modi wrapped up his visit to the Russian city of Kazan on Wednesday after participating in the restricted and open sessions of the 16th BRICS Summit and holding the much-awaited bilateral meeting with the Chinese President Xi Jinping. Just before flying back home, PM Modi also held meetings with the Presidents of the United Arab Emirates (UAE) and Uzbekistan.

PM Modi meets Presidents of UAE and Uzbekistan before concluding 'successful' Russia visit

AI adoption can generate Rs 33.8 lakh cr worth economic value by 2030: Hardeep Puri

AI adoption can generate Rs 33.8 lakh cr worth economic value by  2030: Hardeep Puri
Addressing an event in the national capital, Minister Puri underscored the pivotal role of AI in transforming the energy sector, emphasising that AI is set to revolutionise operations, drive efficiency and accelerate the shift towards a more sustainable energy landscape.

AI adoption can generate Rs 33.8 lakh cr worth economic value by 2030: Hardeep Puri

Punjab CM seeks incentives for industry on par with hill states

Punjab CM seeks incentives for industry on par with hill states
Presenting Punjab's industrial growth before a team of NITI Aayog, Chief Minister Bhagwant Mann on Wednesday sought incentives for industry of the state on a par with neighbouring hill states. Addressing the gathering during the inaugural session of a workshop on MSME exports as drivers of growth for Punjab, the Chief Minister said that "it is the need of the hour to give subsidies and incentives to the industrialists of Punjab on a par with the hill states".

Punjab CM seeks incentives for industry on par with hill states

Cyclone Dana: High alert issued across West Bengal

Cyclone Dana: High alert issued across West Bengal
The administration in West Bengal is on high alert while all necessary precautionary measures have been taken to minimize the impact of Cyclone Dana which is expected to make a landfall between Bhitarkanika of Kendrapara district and the Dhamara area of Bhadrak district. Flight services have been cancelled at Netaji Subhas Chandra Bose International Airport in Kolkata for 15 hours from Thursday.

Cyclone Dana: High alert issued across West Bengal