Close X
Saturday, November 23, 2024
ADVT 
India

Air quality dips to 'severe' levels at several sites in Delhi

Darpan News Desk IANS, 21 Dec, 2023 01:51 PM
  • Air quality dips to 'severe' levels at several sites in Delhi

New Delhi, Dec 21 (IANS) The air quality in several areas of the national capital continues to remain under the "severe" category as per data from several AQI stations across the city on Thursday.

Meanwhile, the India Meteorological Department said that the maximum temperature was recorded at 23 degrees Celsius, a notch above the seasonal average and predicted that the minimum temperature is likely to dip to five degree Celsius during the night.

On Thursday, the air quality at Anand Vihar entered the ‘severe’ category with PM 2.5 at 438 and PM 10 at 359, while the NO2 reached 86 or ‘satisfactory’ and CO was at 118 or ‘moderate’, as per the Central Pollution Control Board (CPCB).

The Bawana station recorded PM 2.5 at 480, while the PM 10 reached 451, in the ‘severe’ category, while the CO reached 106, or ‘moderate’ levels.

The AQI monitoring station at Dwarka Sector 8 recorded PM 2.5 at 419 while PM 10 was at 474 or ‘severe’ while the NO2 was at 72, in ‘satisfactory’ levels.

The AQI at the ITO station was in the ‘severe’ category with PM 2.5 at 441 and PM 10 at 405, while the NO2 was at 195 and CO was at 141, both in the ‘moderate' level. The PM 2.5 at Okhla Phase-II was recorded at 426,and PM 10 at 447, both in the ‘severe’ category. The NO2 was at 163 and CO was at 143, both in ‘moderate’.

At IGI airport, AQI monitoring station the PM 2.5 was at 404 while PM 10 was at 406, both in severe quality while the CO was at 120 or ‘moderate’.

MORE India ARTICLES

Congress delegation meets EC seeking action against PM Modi, Shah

Congress delegation meets EC seeking action against PM Modi, Shah
A delegation of Congress on Tuesday met the Election Commission and sought action against Prime Minister Narendra Modi and Home Minister Amit Shah over violation of the Model Code of Conduct for their remarks on its party leaders despite submitting a complaint few days ago. The party said that it is as much the credibility of the Commission which is a stake as of the Model Code of Conduct.

Congress delegation meets EC seeking action against PM Modi, Shah

Air quality improves at several monitoring stations, Delhi records max temp of 22 degree Celsius

Air quality improves at several monitoring stations, Delhi records max temp of 22 degree Celsius
The air quality in the national Capital continued to remain under the ‘very poor’ category on Tuesday evening with the AQI at 318, according to data from the System of Air Quality and Weather Forecasting And Research (SAFAR). Meanwhile the India Meteorological Department said that the maximum temperature in the national Capital was registered at 22 degrees Celsius, four notches below the seasonal average.

Air quality improves at several monitoring stations, Delhi records max temp of 22 degree Celsius

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand
Minister for Road Transport and Highways Nitin Gadkari on Tuesday said that he was relieved as all the 41 trapped workers from the under-construction Silkyara tunnel in Uttarakhand were rescued safely. He said that it was a well coordinated effort by multiple agencies marking one of the most significant rescue operations in recent years.  

‘Relieved,' says Gadkari after 41 workers rescued in Uttarakhand

Uttarkashi tunnel drilling halted after auger machine platform collapses

Uttarkashi tunnel drilling halted after auger machine platform collapses
The operation to rescue 41 workers trapped inside the collapsed Silkyara tunnel in Uttarakhand's Uttarkashi district was halted after the platform supporting the auger machine which is drilling through the debris collapsed on Thursday evening. Girish Singh Rawat, one of the members of the rescue operation team, said: "Drilling cannot be done until the platform is ready. It may take five to six hours to get the platform ready."

Uttarkashi tunnel drilling halted after auger machine platform collapses

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed
The National High Speed Rail Corporation Limited (NHSRCL) said that 100 km of viaducts were ready for the 508 km of the mega Mumbai-Ahmedabad High Speed Rail Corridor project while 250 km of pier work has been completed. The NHSRCL said that on November 25, 2021 first girder was launched while the first km of viaduct was completed on June 30, 2022 in a span of six months.

Mumbai-Ahmedabad bullet train project: 100 km of viaducts, 250 km pier work completed

Delhi Horror: Demon's street dance, firearms, knives dominate juvenile's social media

Delhi Horror: Demon's street dance, firearms, knives dominate juvenile's social media
Social media posts of the juvenile who stabbed a 17-year-old over 70 times during a street robbery here, likely hinted at his inclination towards violence or "thirst for blood". The accused minor shared videos on his social media account, displaying knives, firearms, and footage of himself within court premises portraying a criminal image, possibly fostering a misguided sense of pride.

Delhi Horror: Demon's street dance, firearms, knives dominate juvenile's social media